This is an old revision of the document!
e14009 to-do list:
Test dE PA box
Zero degree detector
Build mount (UCONN)(1/11/17)
Build detector/Lead (WU) (1/9/17)
Modify copper mouth piece (WU)
Disassemble HiRA Array (Kyle/Pierre/Sean S 1/4)
Reassemble Array (Pierre/Sean S 1/6-1/7)
Install dE PA box (Sean/Juan 1/6)
Test dE's?
Install mount for zero degree detector (1/11 -1/14)
Retest Si E and CsI electronics with pulsers/cosmics (1/16)
Alter trigger logic (Trigger will be either EF and EB or EF and EB and Zero Degree)
Possible Travel days
Alan (1/11-1/18)
Sean/Dan (1/9-1/13)