Ordered list of tasks for e14002:

prior to vault access:

  1. Set up HiRA lab test setup
  2. Test HINP 4 electronics
    • Integrate HINP4 readout code with NSCL DAQ (Kyle)
    • Edit spectcl for HINP 4
    • Pulser test MB1 (14 CBs)
  3. Test CsI shaper/disc
    • Test 5 pico shaper/disc (16 channels each)
    • Confirm with WU/UCONN if first stage shaper gains need adjustment
  4. Alpha Tests of HiRA E's
    • Determine if/which strips are broken
  5. Test dE preamp box (e14009)
    • Determine if/which channels are broken
    • Work with WU to integrate ISEG bias
  6. Retrieve pallets from offsite storage
  7. Set up HiRA mount (outside of chamber) with dummies
    • locate missing pieces
  8. Test HiRA target ladder
    • Work with Craig Snow to modify
  9. Test/locate all internal cables with cable tester, remake/fix any lost or broken cables