User Tools

Site Tools


msu:e14009_to-do_list

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
msu:e14009_to-do_list [2016/09/01 13:10]
brownk
msu:e14009_to-do_list [2016/12/15 16:03]
brownk
Line 1: Line 1:
 e14009 to-do list: e14009 to-do list:
  
-Before e14002 
   - Test dE PA box   - Test dE PA box
-    * How many working sets (32 channels) do we have? Need 14 minimum +    * How will the biases get from ISEG to PA tower -> 4 cables made by WU (1/9/17)
-    * How will the biases get from ISEG to PA tower+
   - Zero degree detector   - Zero degree detector
-    * Need to design and build (WU and UCONN) +    * Build mount (UCONN)(1/11/17
-    * Modify existing HiRA mount to hold detector (Craig Snow + WU/UConn+    * Build detector/Lead (WU) (1/9/17) 
-  - Find and test dE cables from e10011+    * Modify copper mouth piece (WU)  
 +  - Disassemble HiRA Array (Kyle/Pierre/Sean S 1/4) 
 +    * Install 14 dE detectors (Kyle/Pierre 1/4-1/6) 
 +  - Reassemble Array (Pierre/Sean S 1/6-1/7) 
 +  - Install dE PA box (Sean/Juan 1/6)
   - Test dE's?   - Test dE's?
-    * Is there a good/safe way to test these detectors without having to install them in cans? +    * Add HINP3 to DAQ (Kyle 1/7-1/8) 
-  - May replace 1-2 telescopes with HiRA upgrade +    * Test HINP3 MB with pulsers (Kyle 1/7-1/8) 
-    * Design/modify mounting structure to support these detectors +    * Test bias distribution with new cables (1/9) 
-    * Does Alan have separate calibration beams? +    * Hunt noise  
-    * Test HiRA upgrade CsI (Sean, Pierre)+  - Install mount for zero degree detector (1/11 -1/14) 
 +  - Retest Si E and CsI electronics with pulsers/cosmics (1/16) 
 +  - Alter trigger logic (Trigger will be either EF and EB or EF and EB and Zero Degree)
  
  
-After 14002 +Possible Travel days 
-  - Remove HiRA telescopes and install dE detectors +  * Alan (1/11-1/18) 
-  - Install mount for zero degree detector +  * Sean/Dan (1/9-1/13)
-  - Install dE PA box +
-  - Remount HiRA telescopes and zero degree detector +
-  - Set up dE bias --> ISEG +
-  - Test dE with alpha source +
-    Reduce noise +
-  Retest Si E and CsI electronics with pulsers/cosmics +
-  - Alter trigger logic  +
msu/e14009_to-do_list.txt · Last modified: 2017/01/17 11:35 by brownk