User Tools

Site Tools


msu:e14009_to-do_list

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
msu:e14009_to-do_list [2016/12/15 16:03]
brownk
msu:e14009_to-do_list [2017/01/17 11:35]
brownk
Line 22: Line 22:
  
 Possible Travel days Possible Travel days
-  * Alan (1/11-1/18) +  * Alan 1/11-1/18, 2/3 
-  * Sean/Dan (1/9-1/13)+  * Sean/Dan 1/9-1/13 
 + 
 +Other items - added 1/17 
 +Implement dE bias for all detectors, test and calibrate dEs 
 +Install 0deg detector, internal cabling 
 +Setup QDC, test - modify readout and other code to accommodate 
 +Install Cu beam blocks - test all 
 +Install targets 
 +Install beam-pipe section
msu/e14009_to-do_list.txt · Last modified: 2017/01/17 11:35 by brownk