This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
msu:e14009_to-do_list [2016/09/01 13:10] brownk created |
msu:e14009_to-do_list [2017/01/17 11:35] (current) brownk |
||
---|---|---|---|
Line 1: | Line 1: | ||
e14009 to-do list: | e14009 to-do list: | ||
- | Before e14002 | ||
- Test dE PA box | - Test dE PA box | ||
- | | + | * How will the biases get from ISEG to PA tower -> 4 cables made by WU (1/9/17) |
- | | + | |
- Zero degree detector | - Zero degree detector | ||
- | * Need to design and build (WU and UCONN) | + | * Build mount (UCONN)(1/11/17) |
- | * Modify existing HiRA mount to hold detector (Craig Snow + WU/UConn) | + | * Build detector/Lead (WU) (1/9/17) |
- | - Find and test dE cables from e10011 | + | * Modify copper mouth piece (WU) |
+ | - Disassemble HiRA Array (Kyle/ | ||
+ | * Install 14 dE detectors (Kyle/ | ||
+ | - Reassemble Array (Pierre/ | ||
+ | - Install dE PA box (Sean/Juan 1/6) | ||
- Test dE's? | - Test dE's? | ||
- | * Is there a good/safe way to test these detectors without having | + | * Add HINP3 to DAQ (Kyle 1/7-1/8) |
- | - May replace | + | * Test HINP3 MB with pulsers (Kyle 1/7-1/8) |
- | * Design/modify mounting structure to support these detectors | + | * Test bias distribution with new cables (1/9) |
- | * Does Alan have separate calibration beams? | + | * Hunt noise |
- | * Test HiRA upgrade | + | - Install mount for zero degree detector (1/11 -1/14) |
+ | - Retest Si E and CsI electronics with pulsers/ | ||
+ | - Alter trigger logic (Trigger will be either EF and EB or EF and EB and Zero Degree) | ||
- | After 14002 | + | Possible Travel days |
- | - Remove HiRA telescopes and install dE detectors | + | |
- | | + | * Sean/Dan 1/9-1/13 |
- | - Install dE PA box | + | |
- | - Remount HiRA telescopes and zero degree detector | + | |
- | - Set up dE bias --> ISEG | + | |
- | - Test dE with alpha source | + | |
- | * Reduce noise | + | |
- | | + | |
- | - Alter trigger logic | + | |
+ | Other items - added 1/17 | ||
+ | Implement dE bias for all detectors, test and calibrate dEs | ||
+ | Install 0deg detector, internal cabling | ||
+ | Setup QDC, test - modify readout and other code to accommodate | ||
+ | Install Cu beam blocks - test all | ||
+ | Install targets | ||
+ | Install beam-pipe section |